Home Inspections

now browsing by category

 

How to Faux Stone a Concrete, Outside Floor?

Freshen up an outdoor concrete area like a terrace with a Faux Stone Flooring finish, emulating the look of flagstone, cobblestone or whatever rock types suit your look. Create the appearance with several stone shades of paint and handmade stamps.

Clean, Clean, Clean

The concrete must be cleaned extensively before painting or faux finishing; grease, oils,andthe discolorations may often bleed through the color. Scrub the concrete with an all-in-one degreasing, cleaning and etching product suitable for concrete to help put together the concrete for coloring.

Painting the bottom Coat

No real matter what style of faux stone you intend to create, the basic coat of a latex floor and patio enamel offers a backdrop for your handiwork. To create a look of grout or fine sand between the Faux Stone Flooring, select a primary color in the desired grout or gravel shade.

Making Natural stone Stamps

Stamps allow you to create the appearance of individual rocks and never have to hand-paint every single stone onto the Concrete Flooring. Get a few natural stone shapes in the desired sizeofcorrugated scrap cardboard; then cut out the figures. For a flagstone-style design, create designs with angled but marginally softened ends; for river rocks, make the shapes more rounded or oval. More details here.

Turn the Layouts Into Stamps

Switch the cardboard items into stamps by tracing the designs onto dense craft foam, transport foam or upholstery foam, chopping the foam forms out with a computer program knife.

  • The cardboard itself can be used as a stamp — glue on an extra covering or two, cutting each coating to the same size.
  • Car-washing sponges may also be used to produce the stamps by trimming them into the desired shapes.
  • Make a loop of duct tape on the back to make a handle for getting cardboard or rare

Creating the Faux Stone Flooring Design

Step 1 Pour Pools of Paint

Pour several similar stone colors of the latex patio enamel into pools that nearly touch one another atop a plastic tarp or in the lid of a sizable plastic storage area bin.

Step  2 Drop in a Stamp

Dip one of the stone stumps into some of the colorful colors; then press the paint-coated area onto the cement in a part of the project area.

Step 3 3 Dip Another Stamp

Dip the second stamp into the paints; then stamp it next to the first sealed area, giving a gap of 1/8 to 1/4 inches between you two, as if the stones are set in sand, gravel or spaced to permit grout.

Step 4 Dip a 3rd Stamp

Dip yet another stamp into the paints and press it next to the second stamped area.

Step 5 Reuse the Stamps

Re-dip one of the damp stamps into one or more pools of color — an excellent different paint hue than you used the first time. The more shades you use, a lot more natural the rocks look. Press the stamp next to the most recently stamped areas, keeping the Faux Stone Flooring shapes lined up as you work. Continue the process, alternating stamps.

Lastly, Flip the stamps on another way to create the appearance of just one more shape along your faux-stone creation. Continue stamping in rows until the whole concrete area has been stamped. Permit the paint to cure for at least a full day before walking upon it or arranging anything on it. We are here to help when CHOOSING YOUR FLOORING.

Check out http://www.theflooringlady.com/ for more informations and help.

The Basic Home Construction Process

We don’t always have a good idea what happens during the construction process of our homes. For this reason, a lot of home buyers ask a lot of questions such as: How long will the house take to build? What does the construction process involve? When can Ivisit the site?

If you find yourself asking the same questions, this article will help you understand the basic home construction process. Although this article only offers a brief overview, it will still help you get a general idea of how the construction process works. You can see lots of information on the Internet, but I will give you the best processing available.

Stage One: Pre-Construction

Before the home construction begins, the floor plans must first be developed, finalized, and then submitted to the municipal office for review to get a building permit. The building permit is needed for various construction work including electrical, sewer connection, septic system, plumbing, and home building. Additionally, the homebuilders will perform site tests to examine the soil, the capacity of the ground, water table, and environmental tests.

Stage Two: Foundation

After getting the necessary building permit and doing all the initial tests, the land of your house will be prepared. The topsoil will be removed and piled somewhere else to be used later on. Excavation is also done, along with the footings, which are concrete slabs to support the wall foundation, which are formed and poured. The wall foundations are also erected. This process may use concrete temporary wooden forms or preserved wood, or permanent insulated blocks. Weeping tiles are also installed so that the ground moisture will be drained away from the house. During this phase, the homebuilder may ask you to decide on flooring, cabinets, tiles, and many more.

Stage Three: Framing

This phase involves erecting a framing skeleton. The exterior sheeting is also applied or other framing technique can also be used. Frames are also constructed on the floor, one wall at a time and then lifted in place. The windows and doors are also installed during this stage.

During this process, the basement floor is also constructed and installed. Electrical and plumbing are roughed in, along with the heating, cooling, and ventilation. During this stage, the municipality will conduct a structural inspection to make sure that the house is built according to the building codes. Electrical and plumbing inspections will also be conducted.

Stage Four: Interior and exterior work

During the next stage, interior and interior work will be done at the same time; thus, proper scheduling must be observed. The insulation of the exterior walls is done, heating and cooling systems are installed, and vapor barrier will be applied. During this process, the walls and ceilings will also be painted, the flooring is laid, and the cabinets for the kitchen and bathroom are installed. These are just some of the work involved during this stage. Additionally, during this stage, the homebuilder will stay in contact with you to keep you updated on the construction progress.

Visit our site here for more informations and help: http://www.theflooringlady.com/

Here Are Things That You Should Know About Home Construction

Should the average homeowner know anything about home building and construction? Ideally, the answer to this question should be no because it is expected that the contractor be the one to take care of everything. The problem is that there are a lot of things that calls for some awareness on the part of the homeowner, as far as knowledge about home construction is concerned.

One reason why a homeowner should know about home construction is so that they would know if they are really getting a good deal. How could they be aware if the contractor is cheating on the construction materials and methods if they know next to nothing about it?

Another good reason why a homeowner should know about home construction is so that he can be sure that his place would be able to withstand disasters which are becoming more frequent today. There are construction methods and materials that can make a home ready for anything.

Here are some of the basic things that you should know about home construction:

Configuration- You should consider the shape of your house in construction. A regular shape such as a square or even a rectangle can offer more strength when compared with an L-shaped building. So it is better to opt for a construction that’s regular in shape and don’t be too innovative when it comes to this. More details here: http://home.howstuffworks.com/home-improvement/construction/materials/10-rules-for-saving-money-on-construction.htm

Area- It is important that you check the area and its background for possible reasons why you might have to abandon the location later on. It would be a lot more costly if you have to do that after the house has been erected or the construction has already begun. Here are some things that you need to check:

  • Proximity to rivers and lakes that might cause flooding in the area.
  • The possibility of settlement of the ground due to being reclaimed.
  • Presence of smoke and odor from industrial sources.
  • The land depression of the area which will affect the laying of sewers and drains.

Geological Condition-You should check with the local authorities about the geological condition of the area where you are building houses. The ideal location should have a rocky base where the foundation could have a solid base.

Orientation- You should also consider the orientation of your building. This was an important thing for most of the world’s ancient civilizations, and they have traditions regarding this that have some practical application. Some oriental cultures, for example, opt to build with their homes facing east, which aside from being auspicious, would also bring in a flood of morning sunlight to the interior.

Bricks- If you are using red bricks for construction, they ought to be thoroughly soaked in water before each use. If the wall is going to be a long stretch then it would be a good idea to have an expansion joint after every 30 meters. Brick walls should also have strong reinforcements supporting them.

These are just some of the things that you ought to know when it comes to home construction. Of course, it would help a lot if you have the best contractor that you can get.